Plans Global logo Plans GlobalAI · Global

Process

A delivery process built to earn trust at every step

AI projects fail when they skip evaluation or treat launch as the finish line. Our process is designed to avoid both.

What are the phases of an AI project?

Seven phases: discovery, assessment and scope, data review, prototype, evaluation, pilot, and production with continuous improvement. Each phase has an explicit exit criterion agreed with you.

  1. Discovery

    We interview the people who do the work, observe the current process and collect representative examples. Output: a workflow map highlighting the steps where AI could help and those where it should not.

  2. Assessment and scope

    We define the agent's or automation's job, success metrics, escalation rules and constraints. Output: a written scope and custom quote in USD.

  3. Data review

    We assess the quality and accessibility of the information the system will rely on, identify gaps and agree ownership for keeping it current.

  4. Prototype

    A working version is built against real, representative examples, so you can see behavior rather than slides.

  5. Evaluation

    We test systematically: typical cases, edge cases, adversarial inputs and multilingual variants. Results are reviewed against the agreed metrics before any user sees the system.

  6. Pilot

    A limited rollout with close monitoring. Your team reviews outputs and escalations, and we refine prompts, rules, sources and thresholds.

  7. Production and improvement

    Full rollout with monitoring, periodic reviews, source updates and a backlog of improvements prioritized with you.

How do you evaluate an AI system before launch?

With a test set built from your real examples, scored against agreed criteria such as correctness, appropriate escalation and tone, plus deliberate stress tests for edge cases and misuse.

Evaluation is where many projects cut corners. We treat it as a product in itself: a reusable set of cases that is rerun whenever sources, prompts or models change. That way improvements in one area do not silently cause regressions elsewhere.

How long does a typical project take?

A focused pilot is usually measured in weeks. Larger multi-system automations take longer. Timelines depend mainly on data readiness, integration complexity and decision speed.

Your scope document includes a realistic schedule. The quickest projects have a single accountable owner on the client side, accessible examples and clear authority to approve escalation rules.

How is the system governed after launch?

Through monitoring of key metrics, review of escalations and errors, scheduled source updates, change control for prompts and models, and periodic reassessment of risk.

AI systems drift. Policies change, products launch, customer language evolves. A governance routine, typically a monthly review, keeps the system aligned with reality. We provide dashboards or reports appropriate to your scale and a clear process for requesting changes.

How do you handle incidents?

If a system produces a harmful or seriously incorrect output, we pause the affected capability if needed, investigate using logs, fix the root cause, add the case to the evaluation set and report back with what changed. Clear incident handling is agreed at the start so everyone knows their role.

How are stakeholders kept informed?

Through short, regular updates during delivery and agreed reports after launch. Decision-makers see metrics against targets; operational teams see escalations and issues; technical contacts see change logs.

How do you decide what to improve next?

We maintain a backlog ranked by impact and effort, informed by escalation reasons, user feedback and metrics. Each review cycle picks a few items, tests them against the evaluation set and releases them in a controlled way, so improvements are steady and safe.

What documentation do we receive?

Scope documents, architecture notes, source inventories, escalation rules, evaluation sets and runbooks appropriate to the project. Good documentation makes the system understandable to new staff and auditors alike.

Who owns data and outputs?

Your data remains yours. Ownership and licensing of project deliverables are defined in our agreement before work begins, and we explain which third-party services process data and where.

Can we bring the system in-house later?

Where feasible, we document architecture, prompts, evaluation sets and runbooks so your team or another partner can operate the system. Transferability is discussed during scoping.

See solutions or the FAQ for more detail.

What happens after a pilot succeeds?

We plan the production rollout: hardening integrations, setting monitoring and alerting, documenting escalation paths, training the team and agreeing a review cadence for accuracy and cost.

A pilot proves value under controlled conditions; production must survive real volume, edge cases and staff turnover. We treat the transition as its own phase with its own checklist, so the system that reaches your users is maintainable, observable and owned by someone on your side. Ongoing reviews track drift in accuracy and cost, and every change to prompts, models or thresholds is logged so results remain comparable over time.

Bring us a workflow. Leave with a plan.

Describe the process you want to improve. We'll respond with an honest assessment, a phased approach and a custom quote in USD.

WhatsApp